ASN Report 2018

2.7  ̶  Other stakeholders As part of its mission to protect the general public from the health risks of ionising radiation, ASN cooperates closely with other competent institutional stakeholders addressing health issues. 2.7.1  –  The National Agency for the Safety of Medication and Health Products The National Agency for the Safety of Medication and Health Products (ANSM) was created on 1 May 2012. The ANSM, a public body reporting to the Ministry of Health, has taken up the duties of the AFSSAPS alongside other new responsibilities. Its key role is to offer patients equitable access to innovation and to guarantee the safety of health products throughout their life cycle, from initial testing through to monitoring after receiving marketing authorisation. The Agency and its activities are presented on its website: ansm.sante.fr . The ASN-ANSM convention was renewed on 2 September 2013. 2.7.2  –  French National Authority for Health The French National Authority for Health (HAS), an independent administrative Authority created by the French Government in 2004, is tasked primarily with maintaining an equitable health system and with improving patient care. The Authority and its activities are presented on its website has-sante.fr . An ASN-HAS agreement, signed on 4 December 2008, was renewed on 15  December 2015. An ASN-HAS action plan is appended to this agreement and is periodically updated. 2.7.3  –  French National Cancer Institute Created in 2004, the French National Cancer Institute (INCa) is primarily responsible for coordinating activities in the fight against cancer. The Institute and its activities are presented on its website: e-cancer.fr . Regular discussions take place between INCa and ASN. Advisory Committee meetings and visits in 2018 GPE MAIN TOPIC DATE GPR Examination of EPR safety options dossier – newmodel 10 and 11 January GPR Examination of level 1 (PSA 1) and 2 (PSA 2) probabilistic safety assessments for the 1450 MWe nuclear power reactors (N4 plant series) in preparation for their second periodic review 1st February GPU/GPD Periodic safety review of the Aube repository – BNI 149 8 February GPESPN Demonstration of in-service performance of steamgenerator n° 335 of the Fessenheim NPP reactor 2. 27 February GPESPN Management of ageing as part of the 4th periodic safety review of the 900 MWe reactors 15 March GPR Management of ageing of systems, structures and components as part of the 4th periodic safety review of the 900 MWe reactors 21 and 22 March GPRADE Information on the transposition of directive 2013/59/Euratom – Management of contaminated wastes after atmospheric releases – Involvement by the GPRADE and other Advisory Committees 27 March GPMED Order of 22 September 2006 relative to dosimetry information in reports for medical procedures using ionising radiation Presentation of two reports to the SFPM 27 March GPD/GPU Orano (Areva) decommissioning and waste management strategy 11 and 12 April GPU Nuclear fuel cycle in France – Examination of the “2016 Cycle impact” dossier transmitted by EDF 25 May GPR Inspection of Flamanville 3 EPR 30 May GPU/GPD CEA decommissioning and waste andmaterials management strategy 27 and 28 June GPR Commissioning of the Flamanville 3 EPR 4 and 5 July GPRADE Information on the texts implementing Decrees 2018‑437 and 2018‑434 of 4 June 2018 – Changes to Codirpa doctrine – The working group concerning radon exposure in the workplace 5 October GPD Kick-off and informationmeeting on the topic of earthquakes and the Cigeo project 25 October GPT DN30 package model approval application 8 November GPU Inspection of La Hague BNI 117 13 November GPESPN In-service performance of the core zone of the 900 MWe reactor pressure vessels for the 10-year period following their fourth ten-yearly outage inspection 20 and 21 November GPU Periodic safety review of BNI 117 – UP2 800 in the Orano Cycle facility at La Hague (1st meeting on the R2 facility (except the UCD unit) and on the SPF4, SPF5 and SPF6 facilities 4 December GPU Examination of safety dossier for the EDF centralised storage pool 20 December Table 1 ASN report on the state of nuclear safety and radiation protection in France in 2018  125 02 – THE PRINCIPLES OF NUCLEAR SAFETY AND RADIATION PROTECTION AND THE REGULATION AND OVERSIGHT STAKEHOLDERS 02

RkJQdWJsaXNoZXIy NjQ0NzU=