ASN Report 2018
access to its draft resolution on the EDF action plan concerning the implementation of new containment works on the Civaux site, where the pollution containment strategy was considered to be ineffective. The organisation adopted by the sites to prevent risks resulting from the dispersion of pathogenic micro-organisms by the cooling towers needs to be further improved. The time needed to ensure compliance of the methodical risks assessment document led ASN to serve the Chinon site with formal notice on this point on 14 June 2018. Although ASN has observed progress by some sites that had previously been under-performing on the subject of waste management, it is still waiting for EDF to make significant improvements to the organisation on most sites with regard to this topic. On the whole, discharges are considered to be well-managed on the sites. However, evaluation errors detected by the licensee in 2018, or monitoring equipment unavailability constitute occasional weak points in the control of discharges which need to be remedied. Liquid radioactive discharges for the NPPs in 2018 (per pair of reactors) 0 10 20 30 40 50 60 70 80 0 10 20 30 40 50 60 70 80 Activity discharged (TBq) Tritium (TBq) Non-Tritium (GBq) Blayais/2 Bugey/2 Chinon/2 Cruas-Meysse/2 Dampierre-en-Burly/2 Fessenheim Gravelines/3 Saint-Laurent-des-Eaux Tricastin/2 Belleville-sur-Loire Cattenom/2 Flamanville Golfech Nogent-sur-Seine Paluel/2 Penly Saint-Alban/Saint-Maurice Chooz Civaux Graph 3 Gaseous radioactive discharges for the NPPs in 2018 (per pair of reactors) 0 1 2 3 4 5 6 Activity discharged (TBq) Gases (TBq) Halogens and aerosols (GBq) Blayais/2 Bugey/2 Chinon/2 Cruas-Meysse/2 Dampierre-en-Burly/2 Fessenheim Gravelines/3 Saint-Laurent-des-Eaux Tricastin/2 Belleville-sur-Loire Cattenom/2 Flamanville Golfech Nogent-sur-Seine Paluel/2 Penly Saint-Alban/Saint-Maurice Chooz Civaux 0 0,025 0,050 0,075 0,100 0,125 0,150 Graph 4 As there can be a different number of reactors on each site, the results are given “per pair of reactors”, to enable a comparison to be made from one site to another. This for example entails: • keeping the results as-are for the Golfech site, which has two reactors; • dividing by two those of Chinon, which has four reactors (Chinon/2); • dividing by three those of Gravelines, which has six reactors (Gravelines/3). In addition, the discharge data transmitted by EDF to ASN for each site are not representative of the operating time of the installations or of the activities. ASN report on the state of nuclear safety and radiation protection in France in 2018 299 10 – EDF NUCLEAR POWER PLANTS 10
RkJQdWJsaXNoZXIy NjQ0NzU=