ASN Report 2018
— Appendix List of basic nuclear installations undergoing decommissioning or delicensed as of 31 December 2018 INSTALLATION LOCATION BNI TYPE OF INSTALLATION COMMISSIONED FINAL SHUTDOWN LAST REGULATORY ACTS CURRENT STATUS IDE Fontenay-aux- Roses (FAR) (Former BNI 10) Reactor (500 KWth) 1960 1981 1987 : Removed from BNI list Decommissioned Triton FAR (Former BNI 10) Reactor (6.5 MWth) 1959 1982 1987 : removed from BNI list and classified as ICPE Decommissioned ZOÉ FAR (Former BNI 11) Reactor (250 kWth) 1948 1975 1978 : removed from BNI list and classified as ICPE Confined (Museum) Minerve FAR (Former BNI 12) Reactor (0.1 kWth) 1959 1976 1977 : Removed fromBNI list Dismantled at FAR and reassembled at Cadarache EL2 Saclay (Former BNI 13) Reactor (2.8 MWth) 1952 1965 Removed fromBNI list Partially decommissioned, remaining parts confined EL3 Saclay (Former BNI 14) Reactor (18 MWth) 1957 1979 1988 : removed from BNI list and classified as ICPE Partially decommissioned, remaining parts confined Mélusine Grenoble (Former BNI 19) Reactor (8 MWth) 1958 1988 2011 : Removed fromBNI list Cleaned-out Siloé Grenoble (Former BNI 20) Reactor (35 MWth) 1963 2005 2015 : Removed fromBNI list Cleaned out - institutional controls (**) Siloette Grenoble (Former BNI 21) Reactor (100 kWth) 1964 2002 2007 : Removed fromBNI list Cleaned out - institutional controls (**) Peggy Cadarache (Former BNI 23) Reactor (1 kWth) 1961 1975 1976 : Removed fromBNI list Decommissioned César Cadarache (Former BNI 26) Reactor (10 kWth) 1964 1974 1978 : Removed fromBNI list Decommissioned Marius Cadarache (Former BNI 27) Reactor (0.4 kWth) 1960 at Marcoule, 1964 at Cadarache 1983 1987 : Removed fromBNI list Decommissioned Le Bouchet (Former BNI 30) Ore processing 1953 1970 Removed fromBNI list Decommissioned Gueugnon (Former BNI 31) Ore processing 1965 1980 Removed fromBNI list Decommissioned STED FAR (Former BNI 34) Processing of liquid and solid waste Before 1964 2006 2006 : Removed fromBNI list Integrated into BNI 166 STED Cadarache (Former BNI 37) Transformation of radioactive substances 1964 2015 2015 : Removed fromBNI list Integrated into BNIs 37-A and 37-B Harmonie Cadarache (Former BNI 41) Reactor (1 kWth) 1965 1996 2009 : Removed fromBNI list Destruction of the ancillaries building ALS (Former BNI 43) Accelerator 1958 1996 2006 : Removed fromBNI list Cleaned out - institutional controls (**) Strasbourg university reactor (Former BNI 44) Reactor (100 kWth) 1967 1997 2012 : Removed fromBNI list Cleaned out - institutional controls (**) Saturne (Former BNI 48) Accelerator 1966 1997 2005 : Removed fromBNI list Cleaned out - institutional controls (**) Attila* FAR (Former BNI 57) Reprocessing pilot 1968 1975 2006 : Removed fromBNI list Integrated into BNI 165 and 166 LCPu FAR (Former BNI 57) Plutonium chemistry laboratory 1966 1995 2006 : Removed fromBNI list Integrated into BNI 165 and 166 BAT 19 FAR (Former BNI 58) Plutonium metallurgy 1968 1984 1984 : Removed fromBNI list Decommissioned 348 ASN report on the state of nuclear safety and radiation protection in France in 2018 13 – DECOMMISSIONING OF BASIC NUCLEAR INSTALLATIONS
RkJQdWJsaXNoZXIy NjQ0NzU=