Abstracts ASN Report 2019
to water intakes, effluent discharges and environmental monitoring and on the themes linked to the prevention of pollution, the control of non-radiological risks and the management of liquid containment. ASN notes numerous ƺɮƺȇɎɀ ƬȒȇƬƺȸȇǣȇǕ Ɏǝƺ ƺȇɮǣȸȒȇȅƺȇɎ ƳɖȸǣȇǕ א ژח ƏȇƳ ƬȒȇɀǣƳƺȸɀ that the way environmental risks are taken into account by the future licensee must be improved. With regard to worker safety, ASN considers that the development of risks generated by the new activities, including the hot tests, was generally well managed by the existing organisation. Nevertheless, several serious workplace accidents ȒƬƬɖȸȸƺƳ ǣȇ א ژח Əɀ Ə ȸƺɀɖǼɎ Ȓǔ ƫȸƺƏƬǝƺɀ Ȓǔ ƫƏɀǣƬ ȸɖǼƺɀِ xƏȇƬǝƺ ɯƏɀɎƺ ȸƺȵȒɀǣɎȒȸɵ The Manche waste repository (CSM), which was commissioned in 1969, was the first radioactive waste ȸƺȵȒɀǣɎȒȸɵ ȒȵƺȸƏɎƺƳ ǣȇ IȸƏȇƬƺِ ואד ً ژדאא ȅ 3 ژ Ȓǔ ɯƏɀɎƺ ȵƏƬǸƏǕƺɀ are emplaced in it. The CSM stopped accepting further waste in July 1994. Examination of the periodic safety review guidance file had resulted in ASN formulating specific demands at the end of 2017, concerning the justification of the technical principles of deployment of the long-term cover, the CSMmemory system and the updating of the impact study. In this context, ASN began the examination of the CSMperiodic safety review file submitted by Andra in 2019. ASN considers that the organisational set-up implemented ǔȒȸ ȒȵƺȸƏɎǣȇǕ Ɏǝƺ ǔƏƬǣǼǣɎǣƺɀ ǣȇ א ژח ǣɀ ɀƏɎǣɀǔƏƬɎȒȸɵِ Áǝƺ ǼǣƬƺȇɀƺƺ must however improve the the way the monitoring of outside contractors is organised in order to better identify those services that require monitoring and to clearly inform the contractors of the requirements relating to performance of the activities. It must also introduce robustness into deviation management, particularly with regard to meeting commitments and the associated deadlines. Lastly, the licensee must consolidate its integrated management system documents to ensure full consistency between the general operating rules and the various operating procedures. zƏɎǣȒȇƏǼ nƏȸǕƺ RƺƏɮɵ XȒȇ ƬƬƺǼƺȸƏɎȒȸ The National Large Heavy Ion Accelerator (Ganil) economic ǣȇɎƺȸƺɀɎ ǕȸȒɖȵ ɯƏɀ ƏɖɎǝȒȸǣɀƺƳ ǣȇ זח ژ ɎȒ ƬȸƺƏɎƺ Əȇ ǣȒȇ ƏƬƬƺǼƺȸƏɎȒȸ ǣȇ !Əƺȇ ٢ zX ژ ב ٣ِ Áǝǣɀ ȸƺɀƺƏȸƬǝ ǔƏƬǣǼǣɎɵ ȵȸȒƳɖƬƺɀً accelerates and distributes ion beams with various energy levels to study the structure of the atom. The high-energy beams produce strong fields of ionising radiation, activating the materials in contact, which then emit radiation even after the beams have stopped. Irradiation is therefore the main risk presented by Ganil. ”Exotic nuclei” are nuclei which do not exist naturally on Earth. They are created artificially in Ganil for nuclear physics experiments on the origins and structure of matter. In order to be able to produce exotic nuclei, Ganil was authorised ǣȇ א ژא ɎȒ ƫɖǣǼƳ ȵǝƏɀƺ ژ Ȓǔ Ɏǝƺ ³¨X« n ژא ȵȸȒǴƺƬɎً ɯǝȒɀƺ commissioning was authorised by ASN in 2019. In accordance with the requirements of resolution 2015-DC- ד א Ȓǔ ژ hɖȇƺ א ژד ȸƺǼƏɎǣɮƺ ɎȒ ǣɎɀ ǔǣȸɀɎ ȵƺȸǣȒƳǣƬ ɀƏǔƺɎɵ ȸƺɮǣƺɯً Ganil continued its compliance work on the fire-detection and fire-fighting devices, the management of radioactive waste and containment of the facilities. After analysing the difficulties encountered, ASN authorised Ganil to push back the deadlines for the compliance work provided for by six of the ten prescriptions of this periodic safety review. ASN notes an improvement in the management of projects linked to safety and will remain attentive to the meeting of deadlines, as much for Ganil’s commitments as for the requirements laid down by ASN. ASN considers that the organisation defined and implemented ǔȒȸ Ɏǝƺ ȒȵƺȸƏɎǣȒȇ Ȓǔ Ɏǝƺ ǔƏƬǣǼǣɎǣƺɀ ǣȇ א ژח ȅɖɀɎ ƫƺ ǣȅȵȸȒɮƺƳِ The licensee must more specifically supplement its safety analysis report and incorporate all the modifications induced ƫɵ Ɏǝƺ ƬȒȅȅǣɀɀǣȒȇǣȇǕ Ȓǔ ȵǝƏɀƺ ژ Ȓǔ Ɏǝƺ ³¨X« n ژא ǔƏƬǣǼǣɎɵِ JƏȇǣǼ must also pursue its efforts with the updating of its integrated management system in order to improve the integration of changes in the regulatory baseline, especially in the area of radiation protection. Lastly, improvements are also expected in the completeness and quality of the files submitted to ASN. ASN Report on the state of nuclear safety and radiation protection in France in 2019 71 REGIONAL OVERVIEWOF NUCLEAR SAFETY AND RADIATION PROTECTION NORMANDIE
RkJQdWJsaXNoZXIy NjQ0NzU=