ASN Report 2020

INSTALLATION LOCATION BNI TYPE OF INSTALLATION COMMISSIONED FINAL SHUTDOWN LAST REGULATORY ACTS CURRENT STATUS STED FAR (Former BNI 73) Radioactive waste decay storage 1971 2006 2006: Removed fromBNI list Integrated in BNI 166 ARAC Saclay (Former BNI 81) Fabrication of fuel assemblies 1981 1995 1999: Removed fromBNI list Cleaned out LURE (Former BNI 106) Particle accelerators From 1956 to 1987 2008 2015: Removed fromBNI list Cleaned out – institutional controls (***) IRCA (Former BNI 121) Irradiator 1983 1996 2006: Removed fromBNI list Cleaned out – institutional controls (**) FBFC Pierrelatte (Former BNI 131) Fuel fabrication 1990 1998 2003: Removed fromBNI list Cleaned out – institutional controls (**) Miramas uranium warehouse (Former BNI 134) Uranium- bearing materials warehouse 1964 2004 2007: Removed fromBNI list Cleaned out – institutional controls (**) SNCS Osmanville (Former BNI 152) Ioniser 1983 1995 2002: Removed fromBNI list Cleaned out – institutional controls (**) Ulysse (Saclay) 18 Reactor (100 kWth) 1967 2007 2014: Final shutdown and Decommissioning Decree Decommissioning in progress Rapsodie Cadarache 25 Reactor (40 MWth) 1967 1983 Preparation for decommissioning ATPu Cadarache 32 Fuel fabrication plant 1962 2003 2009: Final shutdown and Decommissioning Decree Decommissioning in progress Spent fuel reprocessing plant (UP2) (La Hague) 33 Transformation of radioactive substances 1964 2004 2013: Final shutdown and partial Decommissioning Decree Partial decommissioning in progress STED and High-level waste storage unit Grenoble 36 and 79 Waste treatment and storage facility 1964/1972 2008 2008: Final shutdown and Decommissioning Decree Decommissioning in progress STE Cadarache 37-B Effluent treatment facility (non- permanent part of former BNI 37) 2015 2016 Preparation for decommissioning STE2 (La Hague) 38 Effluent treatment station 1964 2004 2013: Final shutdown and partial Decommissioning Decree Decommissioning in progress Masurca 39 Reactor (5 kWth) 1966 2018 Preparation for decommissioning Osiris-Isis 40 Reactor (70 MWth) 1966 2015 Preparation for decommissioning Éole 42 Reactor (1 kWth) 1965 2017 Preparation for decommissioning Bugey 1 45 Reactor (1,920 MWth) 1972 1994 2008: Final shutdown and Decommissioning Decree Decommissioning in progress Saint‑Laurent‑des‑Eaux A1 46 Reactor (1,662 MWth) 1969 1990 2010: Decommissioning Decree Decommissioning in progress Saint‑Laurent‑des‑Eaux A2 46 Reactor (1,801 MWth) 1971 1992 2010: Decommissioning Decree Decommissioning in progress ÉLAN IIB La Hague 47 Manufacture of caesium-137 sources 1970 1973 2013: Decommissioning Decree Decommissioning in progress High Activity Laboratory (LHA) Saclay 49 Laboratory 1960 1996 2008: Final shutdown and Decommissioning Decree Decommissioning in progress ATUe Cadarache 52 Uranium processing 1963 1997 2006: Final shutdown and Decommissioning Decree Decommissioning in progress MCMF 53 Storage of radioactive substances 1968 2017 Preparation for decommissioning LPC Cadarache 54 Laboratory 1966 2003 2009: Final shutdown and Decommissioning Decree Decommissioning in progress 352 ASN Report on the state of nuclear safety and radiation protection in France in 2020 13 – DECOMMISSIONING OF BASIC NUCLEAR INSTALLATIONS

RkJQdWJsaXNoZXIy NjQ0NzU=