ASN Report 2021

INSTALLATION LOCATION BNI TYPE OF INSTALLATION COMMISSIONED FINAL SHUTDOWN LAST REGULATORY ACTS CURRENT STATUS Phénix (Marcoule) 71 Reactor (536 MWth) 1973 2009 2016: decommissioning decree Decommissioning in progress FessenheimNPP (Fessenheim) 75 Reactor (1,800 MWth) 1977 2020 2020: f inal shutdown Preparation for decommissioning HAO facility (La Hague) 80 Transformation of radioactive substances 1974 2004 2009: f inal shutdown and decommissioning decree Decommissioning in progress Superphénix (Creys-Malville) 91 Reactor (3,000 MWth) 1985 1997 2009: f inal shutdown and decommissioning decree Decommissioning in progress Phébus (Cadarache) 92 Reactor (40 MWth) 1978 2017 Preparation for decommissioning Eurodif (Pierrelatte) 93 Transformation of radioactive substances 1979 2012 2020: partial decommissioning decree Partial decommissioning in progress AMI (Chinon) 94 Utilisation of radioactive substances 1964 2015 2020: decommissioning decree Decommissioning in progress Minerve (Fontenay-aux-Roses) 95 Reactor (100Wth) 1977 2017 Preparation for decommissioning Orphée (Saclay) 101 Reactor (14 MWth) 1980 2019 2019: f inal shutdown Preparation for decommissioning Comurhex (Tricastin) 105 Uranium chemical transformation plant 1979 2009 2019: decommissioning decree Decommissioning in progress Chinon A1 D –former Chinon A1 (Avoine) 133 (Former BNI 5) Reactor (300 MWth) 1963 1973 1982: decree for conf inement of Chinon A1 and creation of the Chinon A1 D storage BNI Partially decommissioned, modif ied to storage BNI for waste left in place. Preparation for complete decommissioning Chinon A2 D –former Chinon A2 (Avoine) 153 (Former BNI 6) Reactor (865 MWth) 1965 1985 1991: decree for partial decommissioning of Chinon A2 and creation of storage BNI Chinon A2 D Partially decommissioned, modif ied to storage BNI for waste left in place. Preparation for complete decommissioning Chinon A3 D –former Chinon A3 (Avoine) 161 (Former BNI 7) Reactor (1,360 MWth) 1966 1990 2010: decommissioning decree Decommissioning in progress EL4-D –former EL4 (Brennilis) 162 (Former BNI 28) Reactor (250 MWth) 1966 1985 1996: decree ordering decommissioning and creation of the EL4-D storage BNI 2006: f inal shutdown and decommissioning decree 2007: decision of the Conseil d’État (State Council) cancelling the 2006 decree 2011: partial decommissioning decree Partial decommissioning in progress. Preparation for complete decommissioning Ardennes NPP –former Chooz A (Chooz) 163 (Former BNIs 1, 2, 3) Reactor (1,040 MWth) 1967 1991 2007: f inal shutdown and decommissioning decree Decommissioning in progress Procédé (Fontenay-aux-Roses) 165 Groupingof former research installations (BNIs57 and59) concerning reprocessingprocesses 2006 2006 2006: f inal shutdown and decommissioning decree Decommissioning in progress Support (Fontenay-aux-Roses) 166 Grouping of former installations (BNIs 34 and 73) for packaging and treatingwaste and effluents 2006 2006 2006: f inal shutdown and decommissioning decree Decommissioning in progress (*) Attila: reprocessing pilot located in a unit of BNI 57. (**) Passive institutional controls. (***) Active institutional controls. ASN Report on the state of nuclear safety and radiation protection in France in 2021 343 13 – DECOMMISSIONING OF BASIC NUCLEAR INSTALLATIONS 08 07 13 04 10 06 12 14 03 09 05 11 02 AP 01

RkJQdWJsaXNoZXIy NjQ0NzU=