INSTALLATION LOCATION BNI No. TYPE OF INSTALLATION COMMISSIONED FINAL SHUTDOWN LAST REGULATORY ACTS CURRENT STATUS LAMA (Grenoble) (Former BNI 61) Laboratory 1968 2002 2017: Removed from BNI list Decommissioned SICN (Veurey-Voroize) (Former BNI 65 and 90) Fuel fabrication plant 1963 2000 2019: Removed from BNI list Buildings demolished, active institutional controls STEDs (Fontenay-aux-Roses) (Former BNI 73) Radioactive waste decay storage 1971 2006 2006: Removed from BNI list Integrated in BNI 166 ARAC (Saclay) (Former BNI 81) Fabrication of fuel assemblies 1981 1995 1999: Removed from BNI list Decommissioned LURE (Bures-sur-Yvette) (Former BNI 106) Particle accelerators From 1956 to 1987 2008 2015: Removed from BNI list Decommissioned‑SUP (***) IRCA (Cadarache) (Former BNI 121) Irradiator 1983 1996 2006: Removed from BNI list Decommissioned‑RUCPE (*) FBFC (Pierrelatte) (Former BNI 131) Fabrication of fuel 1990 1998 2003: Removed from BNI list Decommissioned‑RUCPE (*) Uranium warehouse (Miramas) (Former BNI 134) Uranium-bearing materials warehouse 1964 2004 2007: Removed from BNI list Decommissioned‑RUCPE (*) SNCS (Osmanville) (Former BNI 152) Ioniser 1983 1995 2002: Removed from BNI list Decommissioned‑RUCPE (*) Pégase (Cadarache) 22 Reactor and storage of radioactive substances 1964 2017 – Preparation for decommissioning Rapsodie (Cadarache) 25 Reactor (40 MWth) 1967 1983 2021: Partial decommissioning Decree Decommissioning in progress ATPu (Cadarache) 32 Fuel fabrication plant 1962 2003 2009: Final Shutdown and Decommissioning Decree Decommissioning in progress Spent fuel reprocessing plant – UP2-400 (La Hague) 33 Transformation of radioactive substances 1964 2004 2022: Partial decommissioning Decree Decommissioning in progress STE (Cadarache) 37-B Effluent treatment facility (non-permanent part of former BNI 37) 2015 2016 – Preparation for decommissioning STE2 (La Hague) 38 Effluent treatment station 1964 2004 2022: Partial decommissioning Decree Decommissioning in progress Masurca (Cadarache) 39 Reactor (5 kWth) 1966 2018 – Preparation for decommissioning Osiris-Isis (Saclay) 40 Reactor (70 MWth) 1966 2015 – Preparation for decommissioning Éole / Minerve (Cadarache) 42-U Reactor (1 kWth) and Reactor (100 Wth) 1965 and 1977 2017 2023: Decree for decommissioning and merging of the two BNIs (Éole and Minerve) Decommissioning in progress Bugey 1 (Saint-Vulbas) 45 Reactor (1,920 MWth) 1972 1994 2008: Final Shutdown and Decommissioning Decree Decommissioning in progress St-Laurent-des-Eaux A1 (St-Laurent-Nouan) 46 Reactor (1,662 MWth) 1969 1990 2010: Decommissioning Decree Decommissioning in progress St-Laurent-des-Eaux A2 (St-Laurent-Nouan) 46 Reactor (1,801 MWth) 1971 1992 2010: Decommissioning Decree Decommissioning in progress ELAN IIB (La Hague) 47 Manufacture of caesium-137 sources 1970 1973 2013: Decommissioning Decree Decommissioning in progress LHA (Saclay) 49 Laboratory 1960 1996 2008: Final Shutdown and Decommissioning Decree Decommissioning in progress ATUe (Cadarache) 52 Uranium processing 1963 1997 2021: Decree amending the Decommissioning Decree of 2006 Decommissioning in progress MCMF (Cadarache) 53 Storage of radioactive substances 1968 2017 – Preparation for decommissioning LPC (Cadarache) 54 Laboratory 1966 2003 2009: Final Shutdown and Decommissioning Decree Decommissioning in progress Storage yard 56 Storage of radioactive substances 1968 2023 – Preparation for decommissioning Phénix (Marcoule) 71 Reactor (536 MWth) 1973 2009 2016: Decommissioning Decree Decommissioning in progress ZGDS (Saclay) 72 Transformation of radioactive substances 1971 2022 2022: Decommissioning Decree Preparation for decommissioning ASN Report on the state of nuclear safety and radiation protection in France in 2023 363 • 14 • Decommissioning of Basic Nuclear Installations 14 05 15 08 11 04 06 07 13 AP 03 10 02 09 12 01
RkJQdWJsaXNoZXIy NjQ0NzU=