- 306 - the loss of radiological monitoring - locally and from the control room (SCO) - of the ambient atmosphere in the loading room (SCM), and loss of radiological monitoring of the air extracted from the storage compartments(MA08) due to loss of the supply of their respective air flow pumps. However, as there is no extracted air flow from the storage compartments and no ventilation in the SCM, these measurements are not necessarily representative of possible radiological emissions. Moreover, the total loss of the electrical power supplies can be remedied by deploying the 390 kVA mobile generator set (GEM) or the 25 kVA GEM provided by the Centre within 4 hours. The licensee indicates that for the MASURCA facility, loss of the electrical power supplies does not lead to the risk of a cliff-edge effect and no cooling is required given the current status of the facility. Given the current status of the Masurca facility, the foregoing raises no particular comments from ASN.
RkJQdWJsaXNoZXIy NjQ0NzU=