Les cahiers de l'ASN #05

2024 2025 2026 2027 2028 2029 2030 The periodic safety review* process covers all the topics important for the safety of the facilities and the protection of the population and the environment. Thanks to the experience acquired through the 4th periodic safety review* of the 900 MWe reactors, it was possible to optimise the studies produced and the examination processes used for the 4th periodic safety review of the 1,300 MWe reactors. ASN will thus issue a position statement six months before the beginning of the ten‑yearly outage inspection* of the first reactor to undergo this periodic safety review. The review will then be performed on each of the reactors, starting in 2026. ASN will regulate the continued operation of each reactor following a public inquiry*. PHASE SPECIFIC TO EACH REACTOR ance of IRSN RESULTS PUBLIC INQUIRY INTEGRATION OF THE CONCLUSIONS OF THE REVIEW OF THE FIRST 1,300 MWe(3) REACTORS Meeting of Advisory Committees on the results Meeting of Advisory Committees on the following topics: • hazards • severe accidents • reactor vessel • accident studies EDF periodic safety review concluding report ASN report to the Minister After consultation of the public, ASN resolution regulating the continued operation of each reactor 1. Organised by IRSN, the Anccli and ASN. 2. High Committee for Transparency and Information on Nuclear Security. 3. Paluel 1 and 2, Cattenom 1 are the first reactors to be concerned by these periodic safety reviews. ASN resolution on the generic phase further to the opinion of the Advisory Committees and the public consultation ASN generic requirements TEN‑YEARLY OUTAGE INSPECTION(3) OF THE FIRST REACTOR PRIOR CONSULTATION managed by the HCTISN(2) TORS The issues of the 4th periodic safety review of the 1,300 MWe nuclear reactors • 9

RkJQdWJsaXNoZXIy NjQ0NzU=