News archives

All the latest news from the French Nuclear Safety Authority from 28 February 1999 to 2 January 2025.
The latest news from the French Nuclear Safety and Radiation Protection Authority (ASNR) is now published on the www.asnr.fr website.

479 news

Published on 12/04/2019 at 09:00

Flamanville EPR reactor

On 9 and 10 April 2019, ASN convened its Advisory Committee for Nuclear Pressure Equipment (GP ESPN) concerning the approach proposed by EDF to deal with the deviations detected in welds on the main steam transfer pipes of the Flamanville EPR reactor. Representatives from the Flamanville CLI, the HCTISN, the ANCCLI and foreign safety regulators concerned by the construction of an EPR reactor attended this session as observers.

Published on 28/03/2019 at 11:03

Decommissioning of the first generation gas-cooled reactors

On 12 February 2019, the ASN Commission gave EDF a hearing so that the licensee could make its observations on the draft resolutions to regulate the decommissioning of six gas-cooled reactors, which have been shut down for about thirty years.

Published on 19/03/2019 at 16:04

Auxiliary systems of the backup diesel generating sets for the EDF reactors

In 2017, EDF notified a significant safety event concerning the failure to demonstrate the seismic resistance of the civil engineering anchors of the auxiliary systems of the backup diesel generating sets for its 1300 MWe nuclear power reactors. ASN had rated this event level 2 on the INES scale.

Published on 28/02/2019 at 11:12

Flamanville EPR equipment

In a resolution of 25 February 2019, ASN served EDF with formal notice to produce and save proof of qualification of the Flamanville EPR reactor equipment.

Published on 27/02/2019 at 11:14

Quality assurance requirements for certain medical practices that use ionising radiation

In France, medical applications represent the primary source of artificial exposures of the public to ionising radiation. This medical exposure is increasing, mainly due to the increased number of examinations using computed tomography CT scanners. In order to control the doses delivered to patients undergoing medical imaging examinations, and thereby contribute to enhanced safety for the patients, ASN is defining new quality assurance requirements in medical imaging.

Published on 21/01/2019 at 17:31

Bilateral meeting between ASN and CSN

On 14 January 2019, the ASN Chairman, Mr Bernard Doroszczuk, welcomed, in Montrouge, a delegation of 4 representatives of the Spanish Nuclear Safety Authority (Consejo de seguridad nuclear - CSN), led by its Chairman, Mr. Fernando Marti Scharfhausen.

Published on 27/12/2018 at 12:24

Mr Jean-Luc Lachaume appointed ASN Commissioner

Further to a proposal from the President of the National Assembly, Jean-Luc Lachaume was appointed ASN Commissioner for a six-year term by decree of the President of the Republic dated 21 December 2018.

Published on 27/12/2018 at 12:07

Mr Jean-Luc Lachaume was appointed ASN Commissioner

Further to a proposal from the President of the National Assembly, Jean-Luc Lachaume was appointed ASN Commissioner for a six-year term by decree of the President of the Republic dated 21 December 2018.

Published on 21/12/2018 at 09:54

ASN renews the Advisory Committees for nuclear safety

In the exercise of its duties, ASN coordinates technical investigations which lead to resolutions and opinions. These investigations draw on internal and external expertise, this latter being primarily the responsibility of IRSN, in its capacity as the ASN technical support organisation.

Published on 14/11/2018 at 10:03

Bernard Doroszczuk appointed ASN Chairman

By decree of the President of the Republic, dated 13 November 2018, Bernard Doroszczuk is appointed Chairman of ASN for a period of 6 years. He succeeds Pierre-Franck Chevet, who was appointed ASN Chairman in 2012 and whose mandate came to an end on 12 November 2018.