Resources

References concerning the Flamanville-3 EPR reactor

6 texts

Published on 28/02/2014

ASN STATUTORY RESOLUTIONS

Decision N° 2013-DC-0347 by the ASN of 7 May 2013

Decision N°. 2013-DC-0347 by the French Nuclear Safety Authority of 7 May 2013 setting out requirements to be met by Électricité de France – Société anonyme (EDF SA) at Flamanville nuclear site (Manche) for the Flamanville 3 reactor (INB No. 167) commissioning tests, amending Decision N°. 2008-DC-0114 by the French Nuclear Safety Authority setting out specific requirements to be met by Électricité de France – Société anonyme (EDF-SA) at the Flamanville nuclear site regarding the design and construction of the Flamanville-3 (INB No. 167) reactor and the operation of Flamanville-1 (INB No. 108) and Flamanville-2 (INB No. 109) reactors

Published on 28/02/2014

ASN STATUTORY RESOLUTIONS

Decision N° 2008-DC-0114 by the ASN of 26 September 2008

Decision No. 2008-DC-0114 of 26 September 2008 by the French Nuclear Safety Authority setting Forth Specific Requirementsto Be Met by Électricité de France – Société anonyme (EDF-SA) at the Flamanville Nuclear site Regarding the Design and Construction of the Flamanville-3 (INB No. 167) NPPand the Operation of Flamanville-1 (INB No. 108) and Flamanville-2 (INB No. 109) NPPs

Published on 28/02/2014

DECREES

Decree 2007-1557 of 2 November 2007

Decree 2007-1557 of 2 November 2007 concerning basic nuclear installations and the supervision of the transport of radioactive materials with respect to nuclear safety